用語集

TermDefinition
AnchorStructures embedded into the sea bed that resist the loads from the mooring lines or a floating substructure, or the tendons of a tension leg platform.
Annual energy production (AEP)The amount of energy generated in a year. Gross AEP is the predicted annual energy production based on the turbine power curve, excluding losses. Net AEP is the metered annual energy production at the offshore substation, so includes wind farm downtime, wake, electrical and other losses.
Array cableElectrical cable that connects the turbines to each other and the offshore substation.
Assembly (pre-assembly and final assembly)Pre-assembly: the assembly of components to form major sub-assemblies, such as the pre-assembly of tower sections into a tower.

Final assembly: the assembly of major subassemblies with the floating substructure, to form an assembled floating offshore wind turbine.
AvailabilityThe percentage of time the assets are available to produce / transfer power if the wind speed is within the operational range of the turbine.
Balance of plant (BoP)Includes all the components of the wind farm except the turbines, including transmission assets built as a direct result of the wind farm.
BargeA major type of floating substructure. It has a single hull that pierces the waterline and may be ballasted to provide additional stability.
The Department for Energy Security and Net Zero (DESNZ)DESNZ is the UK Government department responsible for facilitating the deployment of offshore wind and delivering the UK’s wider energy and net zero policies.
ConsentPlanning permission.
Cable protection system (CPS)Cable protection systems protect the subsea cable against various external aggressions. Systems include bend restrictors and bend stiffeners where the cable may be subject to increased loading.
Capacity factorRatio of annual energy production to maximum energy production if the turbine / wind farm ran at rated power all year.
Capital expenditure (CAPEX)Spend on all activities up until works completion date.
CatenaryA type of curve, its shape results from the force of gravity acting on the self-weight of a flexible line between two supported end points. Examples include a mooring chain or a dynamic array cable.
Contract for difference (CfD)Contract where government agrees to pay the wind farm owner the difference between an agreed strike price and the average market price of electricity (reference price). If the difference is negative the wind farm owner pays the difference to the government.
Crew transfer vessel (CTV)A vessel used to transport wind farm technicians and other personnel to the offshore wind farm turbines either from port or from a fixed or floating base. Vessels operating today are typically specially designed catamarans that accommodate around 12 passengers.
Cross-linked polyethylene (XLPE)A thermoset material widely used as electrical insulation in power cables.
Decommissioning expenditure (DECEX)Spend on removal or making safe of floating offshore infrastructure at the end of its useful life, plus disposal of equipment.
Dynamic cableThe section of a cable, whether array or export, that is suspended from a floating substructure and hangs in the water column. The floating end moves (hence the term dynamic) relative to the end that is attached to the sea bed, due to various loads on the substructure and the suspended cable.
Exclusive Economic ZoneAn area of the ocean extending up to 200 nautical miles immediately offshore from a country’s land coast in which that country retains exclusive rights to the exploration and exploitation of natural resources.

Environmental impact assessment (EIA)Assessment of the potential impact of the proposed development on the physical, biological, and human environment during construction, operation and decommissioning.
Engineer, procure, construct, and install (EPCI)A common form of contracting for offshore construction. The contractor takes responsibility for a wide scope and delivers via own and subcontract resources.
Export cableElectrical cable that connects the onshore and offshore substations, or between an AC offshore substation and a DC converter substation.
Front end engineering and design (FEED)Front-end engineering and design (FEED) studies address areas of wind farm system design and develop the concept of the wind farm in advance of procurement, contracting and construction.
Final investment decision (FID)The point at which a developer has in place all the consents, agreements and major contracts required to commence project construction (or these are near execution form) and there is a firm commitment from equity holders and debt funders to provide funding to cover the majority of construction costs.
Floating offshore wind farmA wind farm that uses floating offshore wind turbines.
Floating offshore wind turbineThe integrated wind turbine and floating substructure. The same term is used whether the FOWT is in a port or connected via its mooring system at the wind farm site.
Floating substructureA buoyant substructure for turbines, or offshore substations, anchored to the sea bed via mooring lines. The term includes several platform types including spar buoy, barge, tension leg platform and semi-submersible.
Gas insulated switchgear (GIS)Gas-insulated switchgear is often chosen for its compactness and increased reliability over air insulated switchgear but has higher cost.
Gigawatt (GW) and Gigawatt hour (GWh)Unit of power and unit of energy.
High voltage alternating current (HVAC)An electric power transmission system that uses alternating current for the bulk transmission of electrical power. Alternating current is the form in which electric power is generated by wind turbines and delivered to an end user.
High voltage direct current (HVDC)An electric power transmission system that uses direct current for the bulk transmission of electrical power. For long-distance transmission, HVDC systems may offer lifetime cost advantages over HVAC systems over long transmission distances. They are currently only used for point-to-point connections.
Highest astronomical tide (HAT)The highest tidal height predicted to occur under average meteorological conditions and any combination of astronomical conditions.
Horizontal directional drilling (HDD)Horizontal directional drilling is a low impact (trenchless) method of installing underground cables using a surface-launched drilling rig.
Jacket foundationA major type of fixed foundation used for offshore substations and wind turbines. It consists of a small number of legs which support the major loads, connected to each other by braces to prevent buckling.
JewelleryThe collective term for equipment attached to a mooring line, including: floatation elements, clump masses, shackles, H-links and load reduction devices.
Levelised cost of energy (LCOE)Levelised cost of energy is a commonly used measure of the cost of electricity production. It is defined as the revenue required (from whatever source) to earn a rate of return on investment equal to the WACC over the life of the wind farm. Tax and inflation are not modelled.
Mean high water springs (MHWS)The average tidal height throughout the year of two successive high waters during those periods of 24 hours when the range of the tide is at its greatest.
Mean sea level (MSL)The average tidal height over a long period of time.
Megawatt (MW) and Megawatt hour (MWh)Unit of power and unit of energy.
Monopile foundationA type of foundation with a cylindrical tube (normally steel) that is normally driven tens of metres into the sea bed, although it can also be inserted into pre-drilled holes.
Mooring lineThe line used to connect a floating substructure to an anchor. It can be made from steel chain, steel wire rope, or synthetic fibre rope.
Offshore substation (OSS)The structure used to transform and transfer the energy collected by the wind turbines to land in the most efficient manner. It may involve increasing the voltage, providing reactive compensation, and converting the current from AC to DC. Some wind farms may have more than one offshore substation and equipment may be located on a number of smaller structures and potentially on one or more turbine transition pieces.
Offshore Transmission Owner (OFTO)An OFTO, appointed in UK by Ofgem (Office of Gas and Electricity Markets), has ownership and responsibility for the transmission assets of an offshore wind farm.
Operational expenditure (OPEX)Spend on all activities from work completion date until decommissioning.
Operations and maintenance (O&M)O&M comprises wind farm O&M and onshore transmission O&M.

Definitions of O and M are as follows:

Operations: day-to-day management including all the work not covered under maintenance and service. For wind farm O&M, this includes cost for port facilities, buildings, management personnel, environmental monitoring and community engagement.

Maintenance of assets: scheduled (that is, planned a long time in advance) maintenance, that may be based on suppliers' recommendations or owner's experience. It includes condition-based or time-based maintenance programmes and planned health and safety inspections.

Typical maintenance includes inspection, checking of bolted joints and replacement of wear parts (with design life less than the design life of the project).

Maintenance also includes the unscheduled interventions in response to events or failures. Interventions may be proactive (before failure occurs, for example responding to inspections or condition monitoring or reactive (after failure that affects generation has occurred). Also included are interventions due to major components not lasting the full turbine design life (even if intervention was planned prior to construction) and both on site repair and replacement of large and small components.
PortsManufacturing port: where equipment is made and shipped from, such as turbines or balance of plant.

Construction port: where equipment is stored and pre-assembled, then finally assembled, before transport to site.

O&M port: the base port for operations and maintenance vessels and supporting materials.

Major repair port: a port which can accommodate major repairs of floating offshore wind turbines.
Remotely operated vehicle (ROV)ROVs are remotely guided subsea mobile devices. They are usually deployed from a vessel. ROVs can be used for inspections or to carry out handling and repair.
Self-propelled modular transporter (SPMT)SPMTs are remotely operated flatbed haulers used to transport large and heavy objects around ports and construction sites.
Semi-submersibleA major type of floating substructure. It has a large structure comprised of several buoyant columns or turrets that are connected using pontoons and/or trusses. It is typically ballasted to provide additional stability.
Service operation vessel (SOV)A vessel that provides accommodation, workshops, and equipment for the transfer of personnel to turbine during O&M. Vessels in service today are typically up to 85m long with accommodation for about 60 people.
Significant wave height (Hs)The wave height (trough to crest) of the highest third of the waves over a given period.
SparA major type of floating substructure. It consists of a tall cylinder housing dense ballast in its lower part and has a large draft.
Supervisory Control and Data Acquisition (SCADA) systemData acquisition, transmission and storage system covering all wind farm assets. The SCADA system enable individual wind turbines, the wind farm substations and associated wind farm equipment to communicate operational status including faults. This allows operators to remotely diagnose faults and issue commands to stop, start and reset turbines and other equipment. The SCADA system keeps a full operating history of the wind farm.
Tension leg platform (TLP)A major type of floating substructure. It is relatively small compared to other types of floating substructure and its stability is provided by rigid, vertical, tendons.
Transition pieceA part of the platform that provides the connection between the platform and the wind turbine tower. For floating substructures, it is usually an integral part of the platform.
Turbine rated powerThe nominal maximum power output from a wind turbine. Sometimes this is referred to as capacity. The wind turbine is limited to this power output, which typically applies when the wind speed at the hub height exceeds about 12m/s and continues until about 25-30m/s when the wind turbine stops generating to avoid excessive loading. In more benign operating conditions characterised by ambient temperature, main component temperatures, wind speed, turbulence level and grid voltage levels, the output may be allowed to exceed the rated power by about 5%.
Unexploded ordnance (UXO)Explosive weapons that did not explode when they were released and remain a risk to seabed users.
Weighted average cost of capital (WACC)The weighted average rate of return a wind farm owner expects to compensate itself and its internal and external investors over the life of a project.
Wind shearThe degree to which wind speed changes with height.
Works completion date (WCD)Date at which construction works are deemed to be complete and the wind farm is handed to the operations team. In reality, this may take place over a period of time.
用語定義
アンカー係留索や浮体式基礎構造物、あるいは TLP (テンション レッグ プラットフォーム) のテンドンによる荷重に耐えるために海底に埋め込まれた構造物。
年間推定発電量 (AEP)1 年間の発電量。グロス AEP は、タービン出力曲線に基づき、損失を除外して予測される年間発電量です。ネット AEP は、洋上変電所で計測された年間発電量であり、風力発電所のダウンタイム、風車ウェイク、電気損失などの損失が含まれます。
アレイケーブルタービン同士および洋上変電所を接続する電気ケーブル。
組立 (プレアセンブリおよび最終組立)プレアセンブリ: タワーセクションをタワーに事前組み立てするなど、主要なサブアセンブリを形成するためにコンポーネントを組み立てる工程。
最終組立: 主要なサブアセンブリを浮体式基礎構造物に組み付け、組み立てられた浮体式洋上風力タービンを形成する工程。
稼働率タービンが風速の運転範囲内にある場合に、発電設備が発電可能な時間の割合。
周辺設備/バランス オブ プラント (BoP)風力発電所のタービン以外の全構成要素 (風力発電所の設置に伴い建設される送電関連設備を含みます)。
バージ型主要な浮体式基礎構造の一種です。喫水線上に浮かぶ単一の浮体を持ち、安定性を高めるためにバラストを積むことができます。
エネルギー安全保障・ネットゼロ省(DESNZ: Department for Energy Security and Net Zero)ビジネス、産業戦略、科学とイノベーション、エネルギーと気候変動政策を担当する英国政府省庁。
許認可計画許可。
ケーブル保護システム (CPS)ケーブル保護システムは、海底ケーブルをさまざまな外的損傷から保護します。システムには、ケーブルにかかる負荷が増加する可能性がある曲げ制限装置や曲げ補強材が含まれます。
設備利用率タービン/風力発電所が年間を通じて定格出力で稼働した場合の、年間発電量と最大発電量の比率。
設備費 (CAPEX)工事完了日までのすべての活動に対する支出。
カテナリー曲線2 つの支持端点間に張られた柔軟な線の自重に重力が作用することで生じる曲線の一種。例としては、係留チェーンやダイナミックアレイケーブルなどが挙げられます。
差金決済契約 (CfD)政府が、予め定められた固定買取価格 (ストライクプライス) と電力の平均市場価格 (参照価格) との差額を風力発電事業者に補填する契約。市場価格が固定買取価格を上回った場合は、風力発電事業者がその差額を政府に支払う仕組み。
作業員輸送船 (CTV)港湾、着床式または浮体式の作業拠点より、洋上風力発電所に向けて技術者やその他の人員を輸送するために使用される船舶。現在運用されている船舶は、通常、約 12 人の乗客を収容できる特別に設計された双胴船。
架橋ポリエチレン (XLPE)電力ケーブルの電気絶縁体として広く使用されている熱硬化性材料。
廃止費用 (DECEX)耐用年数経過時の浮体式洋上インフラの撤去または安全化、および設備の廃棄にかかる費用。
ダイナミックケーブルアレイケーブルまたはエクスポートケーブルのいずれかで、浮体式基礎構造から吊り下げられ、水柱 (ウォーターカラム: Water Column) 内に垂れ下がっているケーブルの部分。浮体端は、基礎構造物と吊り下げられたケーブルにかかるさまざまな荷重により、海底に取り付けられた端に対して相対的に動きます (そのため、「ダイナミック: 動的」と呼ばれます)。
排他的経済水域 (EEZ)国の海岸から 200 海里以内の海域で、その国が天然資源の探査と開発の 独占 権を保持する海域。
環境影響評価 (EIA)建設、運用、廃止の期間中に提案された開発が物理的、生物学的、および人的環境に及ぼす潜在的な影響への評価。
設計・調達・建設・据付 (EPCI)オフショア建設における一般的な契約形態。請負業者は広範囲にわたる責任を負い、自社および下請けのリソースを通じて業務を遂行します。
送電ケーブル陸上変電所と洋上変電所、または交流洋上変電所と直流変換変電所を接続する電気ケーブル。
基本設計 (FEED: Front End Engineering and Design)基本設計 (FEED) 調査では、風力発電所のシステム設計の分野を対象とし、調達、契約、建設に先立って風力発電所のコンセプトを開発します。
最終投資決定 (FID)開発者がプロジェクトの建設を開始するために必要なすべての許認可、合意、および主要契約を締結し (または締結間近であり)、株式保有者と債務提供者から建設費用の大部分を賄うための資金提供の確固たる約束が得られた時点。
浮体式洋上風力発電所浮体式洋上風力タービンを採用した風力発電所。
浮体式洋上風力タービン風力タービンと浮体式下部構造物が一体化したもの。港湾内にある場合も、風力発電所の敷地内の係留システムを介して接続されている場合も、同じ用語が使用されます。
浮体式基礎構造物タービンまたは洋上変電所用の浮力式基礎構造物で、係留索を介して海底に固定されています。この用語には、スパー型、バージ型、TLP (テンション レグ プラットフォーム)型、セミサブ 型など、いくつかの基礎構造タイプが含まれます。
ガス絶縁開閉装置 (GIS)ガス絶縁開閉装置は、空気絶縁開閉装置と比べてコンパクトさと信頼性が高いため選択されることが多いものの、コストは高くなります。
ギガワット (GW) とギガワット時 (GWh)電力の単位と電力量の単位。
高圧交流 (HVAC)電力の大量送電に交流を使用する電力伝送システム。交流電流は、風力タービンによって発電され、最終ユーザーに供給される電力の形態です。
高圧直流 (HVDC)電力の大量送電に直流を使用する電力伝送システム。長距離送電の場合、HVDC システムは HVAC システムよりも生涯コスト面で有利になる可能性があります。現在はポイントツーポイント接続にのみ使用されています。
誘導式水平ドリル工法 (HDD 工法)誘導式水平ドリル工法は、地上の掘削装置を用いて地下ケーブルを敷設する際に、地表への影響を最小限に抑える (非開削) 工法です。
ジャケット基礎洋上変電所や風力タービンに使用される着床式基礎の主要タイプ。これは、主要な荷重を支える数か所の脚で構成されており、各脚は座屈を防ぐためにブレースで相互接続されています。
接続ジョイント係留索に取り付けられる機器の総称で、浮力要素、加重体 (clump masses)、シャックル、H リンク、荷重軽減装置などが含まれます。
均等化発電原価 (LCOE)均等化発電原価は、電力生産コストの一般的な指標です。これは、風力発電所の耐用年数にわたって WACC (加重平均資本コスト) に等しい投資収益率を得るために必要な収益 (資金源を問わない) として定義されます。税金とインフレはモデル化されていません。
大潮平均高潮面 (MHWS)潮の干満差が年間で最も大きくなる期間(大潮)における、24 時間内の連続する 2 回の満潮の平均潮位を、一年を通して平均したもの。
平均海面水位 (MSL)長期間にわたる平均潮位高。
メガワット (MW) とメガワット時 (MWh)電力の単位と発電量の単位。
モノパイル基礎基礎の一種。通常は鋼製の円筒状の杭を一本、海底数十メートルの深さまで打ち込みますが、事前に掘削した穴に杭を挿入することもできます。
係留索浮体基礎構造をアンカーに接続するために使用されるロープ。鋼鎖、鋼線ロープ、または合成繊維ロープ製などがあります。
洋上変電所 (OSS)風力タービンによって集められた電力を最も効率的に変圧し、陸地へ送電するために使用される構造物。機能には、昇圧、無効電力の補正、交流から直流への変換が含まれる場合があります。一部の風力発電所には複数の洋上変電所があり、変電機器は多数の小規模な構成のものや、場合により 1 つ以上のタービントランジションピースに設置されている場合があります。
洋上送電事業者 (OFTO)英国では、Ofgem (ガス・電力市場庁) の任命を受け、OFTO が、洋上風力発電所の送電設備の所有権と責任を負います。
事業運営費 (OPEX)工事完成日から廃止までのすべての活動に対する支出。
運用・保守管理 (O&M)O&M は、風力発電所の O&M と陸上送電線の O&M で構成されます。
運用・保守管理 (O&M) の定義は次のとおりです。
運用: メンテナンス・保守サービスに含まれないすべての作業を含む日常的な管理。風力発電所の O&M の場合、港湾施設、建物、管理要員、環境監視、地域社会との連携にかかるコストが含まれます。
資産の保守管理: サプライヤーの推奨や所有者の経験に基づいて予定される、(つまり、かなり前から計画された) メンテナンス。状態基準または時間基準の保守プログラム、および計画的安全衛生点検を含みます。
メンテナンスには通常、検査、ボルト接合部のチェック、摩耗した (設計寿命がプロジェクトの設計寿命よりも短い) 部品の交換が含まれます。
メンテナンスには、事象や障害に対応した予定外の作業も含まれます。たとえば検査や状態監視結果への対応など、予防的な (障害が発生する前の) もの、または受動的な (発電に影響する障害が発生した後の) ものになります。また、風力タービンの設計寿命に満たない主要部品の故障による修理・交換 (建設前に修理・交換が計画されていた場合も含む)、および大小の部品の現場での修理・交換も含まれます。
港湾製造港湾: タービンやプラント周辺装置 (バランス オブ プラント) などの機器が製造・出荷される場所。
建設港湾: 設備が保管・事前組立され、現場輸送前に最終組立される場所。
O&M 港: 運用・保守管理船舶と支援資材の基地港湾。
大規模修理港湾: 浮体式洋上風力タービンの大規模修理に対応可能な港湾。
遠隔操作型無人潜水機 (ROV)ROV は遠隔操作による海中移動装置です。通常は船舶から投入されます。ROV は検査や操作、修理に使用できます。
自走式モジュラートランスポーター (SPMT)SPMT は、港湾や建設現場周辺で大型・重量物輸送に使用される遠隔操作の運搬トレーラー車です。
セミサブ型主要な浮体式基礎構造の一種です。ポンツーンやトラスで接続された複数の浮力のある柱またはタレットで構成される大型構造物です。通常は、安定性を高めるためにバラストを積みます。
サービス運行船 (SOV)O&M 中、タービンへ要員を移送するための宿泊施設、作業場、設備を備えた船舶。現在運用中の船舶は、通常、全長 85 m までで、約 60 名の宿泊設備を有します。
有義波高 (Hs)一定期間における波の高さ (波の谷から山までの高さ) のうち、上位 3. 分の 1 (33%) の平均値です。
スパー型主要な浮体式基礎構造の一種です。下部に高密度のバラストを収納した背の高い円筒で構成されており、喫水が大きくなります。
監視制御データ収集 (SCADA) システム風力発電所のすべての設備を網羅するデータ収集・伝送・保存システム。SCADA システムにより、個々の風力タービン、風力発電所の変電所、および関連する風力発電所設備が、障害を含む動作状態を通信できるようになります。これにより、オペレーターは遠隔で故障診断を行い、タービンやその他の設備の停止・起動・リセットのコマンドを発行できます。SCADA システムは風力発電所の完全な運用履歴を保持します。
TLP (テンション レッグ プラットフォーム) 型主要な浮体式基礎構造の一種です。他の浮体式下部構造タイプと比べて比較的小型で、垂直または主に垂直のテンドンによって安定性が提供されます。
トランジションピースプラットフォームと風力タービンタワー間を接続するプラットフォームの一部。浮体式基礎構造にある場合、通常プラットフォームの不可欠な部分となります。
タービン定格出力風力タービンの公称最大出力。設備容量と呼ばれることもあります。風力タービンはこの出力値に制限されます。この値は通常、ハブの高さでの風速が約 12 m/s を超えたときに適用され、過度の荷重を避けるために風力タービンが発電を停止する約 25~30 m/s まで続きます。周囲温度、主要コンポーネントの温度、風速、乱流レベル、電力系統の電圧レベルなどが穏やかな動作条件では、定格出力を約 5% 超えることが許容される場合があります。
不発弾 (UXO)投下時に爆発せず、海底利用者にとって依然として危険を呈する爆発性兵器。
加重平均資本コスト (WACC)風力発電所の所有者が、プロジェクトのライフサイクル全体にわたって、自己資金および内外投資家への償還のために期待される加重平均収益率。
ウィンドシア高度に応じて風速が変化する度合い。
工事完了日 (WCD)建設工事が完了したとみなされ、風力発電所が運用チームに引き渡される日付。実際には、これは一定期間にわたって行われる可能性があります。
용어정의
앵커계류삭이나 부유식 하부 구조물 또는 인장각형의 텐던(Tendon)에서 발생하는 하중을 견디는 해저에 매립된 구조물.
연간 에너지 생산량(AEP)1년에 생산되는 에너지의 양이다. 총 AEP는 손실을 제외한 터빈 동력 곡선을 기준으로 예상되는 연간 에너지 생산량이다. 순 AEP는 해상 변전소의 연간 에너지 생산량으로, 풍력 발전 가동중단시간, 후류, 전기 및 기타 손실이 포함된다.
내부망 (Array cable)터빈을 서로 연결하고 해상 변전소와 연결하는 전기 케이블.
조립(사전 조립 및 최종 조립)사전 조립: 타워 섹션을 완전한 타워로 조립하는 것처럼 개별 구성품을 주요 하위 어셈블리로 결합하는 프로세스
최종 조립: 주요 하위 어셈블리를 부유식 하부 구조물과 통합하여 완전히 조립된 부유식 해상 풍력 터빈 건설
가동률(Availability)풍속이 터빈의 작동 범위 내에 있을 경우풍력터빈이 동력을 생산/전달하는 데 사용할 수 있는 시간의 백분율.
주변설비(BOP)터빈을 제외한 풍력발전단지의 구성품과 풍력발전단지를 위해 특별히 개발된 송전 설비가 포함된다.
바지형(Barge)부유식 하부 구조물의 주요 유형이다. 단인 선체로 수선을 관통하며 안정성을 높이기 위해 밸러스트를 사용할 수 있다.
인허가승인 활동 계획.
케이블 보호 시스템(CPS)다양한 외부 공격으로부터 해저 케이블을 보호하는 시스템이다. 시스템에는 케이블이 하중을 증가시킬 수 있는 굽힘 제한 장치와 굽힘 보강재가 포함된다.
설비이용률(Capacity Factor)터빈/풍력발전단지가 일 년 내내 정격 전력으로 운영되는 경우 최대 에너지 생산에 대한실제연간 에너지 생산의 비율.
자본적 지출(CAPEX)작업 완료일까지 모든 활동에 지출한 비용을 말한다.
현수선(Catenary)곡선의 한 유형으로, 두 개의 고정점 사이에 매달린 유연한 선의 자체 중량에 따라 형성되는 곡선 모양 계류 체인 또는 동적 내부망이 그 예이다.
차액결제계약(CFD)정부가 풍력발전단지 소유업체에게 합의된 행사가격과 전기의 평균 시장가격(기준가격)의 차액을 지급하기로 합의하는 계약이다. 차이가 마이너스이면 풍력발전단지 소유업체가 정부에 차액을 지불한다.
인력수송선박(CTV)항구 또는 고정식 또는 부유식 기지에서 풍력발전단지 엔지니어와 기타 직원을 해상 풍력발전단지 터빈으로 운송하는 데 사용되는 선박이다. 오늘날에는 일반적으로 12명의 승객을 수용할 수 있는 특별히 설계된 쌍동선을 운행한다.
가교 폴리에틸렌(XLPE)전원 케이블의 전기 절연재로 널리 사용되는 열경화성 자재이다.
폐기 비용(DECEX)수명이 다한 부유식 해상 인프라 철거 또는 안전하게 만드는 행위 및 장비 폐기에 사용되는 비용
동적 케이블어레이 또는 외부망을 불문하고 부유식 하부 구조물에 매달린 케이블 섹션으로움직임이 있는 환경에서 안정적으로 전력을 전송하거나 신호를 주고받을 수 있도록 특별히 설계되어 있다. 부유식 종단은 하부 구조물과 매달린 케이블에 작용하는 하중이 다양하여 해저에 고정된 종단 지점에 따라서 움직이기에 동적이라는 용어를 사용한다.
배타적 경제 수역(EEZ)천연자원의 탐사 및 개발에 대한 독점적 권리를 보유한 국가의 육상 해안으로부터200해리까지 확장되는 해양 지역
환경영향평가(EIA)제안된 개발이 건설, 운영, 해체 과정에서 물리적, 생물학적, 인체 환경에 미치는 잠재적 영향에 대한 평가.
설계, 조달, 건축, 설치(EPCI)해상 건축을 위한 일반적인 계약 형태. 계약업체는 광범위한 범위를 책임지고 자체 및 하도급 자원을 사용해 납품한다.
외부망육상과 해상 변전소를 연결하거나 AC 해상 변전소와 DC 변환기 변전소 사이를 연결하는 전기 케이블이다.
프론트 엔드 엔지니어링 및 설계(FEED)FEED(Front-end Engineering and Design) 연구는 풍력발전단지 시스템 설계 영역을 다루고 조달, 계약, 건축에 앞서 풍력발전단지의 개념을 구체화한다.
최종 투자 결정(FID)개발업체가 프로젝트 건설 시작에 필요한 모든 동의, 합의, 주요 계약을 체결했거나 체결이 임박했으며, 지분 소유업체와대출 제공업체로부터 건설 비용의 대부분을 충당할 자금을 제공하겠다는최종 결정을 명기한다.
부유식 해상 풍력발전단지부유식 해상 풍력 터빈을 사용하는 풍력발전단지이다.
부유식 해상 풍력 터빈통합형 풍력 터빈 및 부유식 하부 구조물. 항구에 있거나 풍력발전단지 부지에서 계류 장치를 통해 연결되었든 동일한 용어가 사용된다.
부유식 하부 구조물계류삭을 통해 해저에 고정된 터빈 또는 해상 변전소의 부력 하부 구조물이다. 이 용어는 스파형 부표, 바지형, 인장각형, 반잠수식을 포함한 여러 하부 구조 유형을 포괄한다.
가스 절연 개폐장치(GIS)가스 절연 개폐장치는 공기 절연 개폐장치에 비해 간편하고 신뢰성이 높기 때문에 선택하는 경우가 많지만 비용이 비싸다.
기가와트(GW) 및 기가와트시(GWh)전력의 단위와 에너지의 단위.
고전압 교류 송전(HVAC)교류 전류를 활용하여 전력을 대량 전송하는 전력 전송 시스템이다. 교류 전류는 풍력 터빈이 전력을 생산하고 최종 사용자에게 전달되는 형태이다.
고전압 직류 송전(HVDC)직류 전류를 활용하여 전력을 대량 전송하는 전력 전송 시스템이다. 장거리 전송의 경우, HVDC 시스템은 HVAC 시스템에 비해 평생 비용 이점을 제공할 수 있다. 현재 지점 간 연결에만 사용된다.
수평지향성 압입공법(HDD)수평지향성 압입공범(HDD)은 지표면 시추 장비를 사용하여 지하 케이블을 설치하는 저충격(비굴착) 방식이다.
재킷 기초 구조물해상 변전소 및 풍력 터빈에 사용되는 고정식 기초 구조물의 주요 유형. 소수의 다리가 주요 하중을 지탱하며 좌굴 방지를 위해 브레이스로 서로 연결한다.
부속품(Jewellery)계류삭에 연결된 장비의 총칭으로서 부력 장치,클럼프 웨이트, 셰클, H고리, 하중저감장치를 총칭해서 일컫는다.
균등화발전비용(LCOE)균등화발전비용은 일반적으로 사용되는 전기 생산 비용의 척도이다. 풍력발전단지의 수명 기간 동안 가중평균자본비용(WACC)과 동일한 투자 수익률을 달성하기 위해 필요한 수익(출처에 관계없이)으로 정의된다. 세금과.
대조평균고조위면(MHWS)24시간 동안 조수 간만의 차가 최대인 두 차례 연속 만조가 발생하는 연평균 조수 높이.
평균 해수면(MSL)장기간에 걸친 평균 조수 높이.
메가와트(MW) 및 메가와트시(MWh)전력의 단위와 에너지의 단위.
모노파일 기초 구조물원통형 튜브(일반적으로 강철)가 있는 기초 구조물 유형으로, 일반적으로 수십 미터 해저에 항타식으로 설치되지만 미리 뚫은 구멍에도 삽입할 수 있다.
계류삭부유식 하부 구조물을 앵커에 연결하는 데 사용되는 줄이다. 강철 사슬, 강철 밧줄, 합성 섬유 밧줄로 만들 수 있다.
해상 변전소(OSS)풍력 터빈에서 생성된 에너지를 효율적으로 변환하여 육상으로 송전하도록 설계된 구조물이다. 여기에는 전압을 높이고, 무효전력보상을 제공하고, 전류를 AC에서 DC로 변환하는 작업이 포함될 수 있다. 일부 풍력발전단지에는 여러 개의 해상 변전소가 있을 수 있으며 장비가 여러 개의 작은 구조물에 분산되어 있고, 경우에 따라 하나 이상의 터빈 트랜지션 피스에 설치할 수 있다.
해상 송전 사업자(OFTO)영국 가스전력규제청(Ofgem) 지정하는 OFTO는 해상 풍력발전단지의 송전 자산에 대한 소유권과 책임이 있다.
운영비용(Opex)작업 완료일부터 해체까지 모든 활동에 지출한 비용을 말한다.
운영 및 유지보수(O&M)O&M은 풍력 발전 O&M과 육상 송전 O&M으로 구성된다.
O와 M의 정의는 다음과 같다.
Operation(운영): 유지보수 및 점검에 포함되지 않는 모든 작업을 포함한 일상적인 관리. 풍력발전단지 O&M의 경우, 여기에는 항만 시설, 건물, 관리 인력, 환경 모니터링, 지역 사회 참여 비용이 포함된다.
설비 유지보수: 공급업체의 권장 사항 또는 소유업체의 경험을 바탕으로 계획된(즉, 오래전에 미리 계획된 유지보수) 유지보수. 여기에는 상태 기반 또는 시간 기반 유지보수 프로그램과 건강 및 안전 검사가 포함된다.
일반적인 유지보수 작업에는 점검, 볼트 접합부 점검, 마모된 부품(프로젝트의 전체 설계 수명보다 수명이 짧은 부품) 교체가 포함된다.
또한 유지보수 작업은 갑작스런 이벤트 또는 장애에 대한 응답으로 예정되지 않은 개입이 포함된다. 개입은 사전 예방적(고장 발생 전에 점검 또는 상태 모니터링을 통해) 또는. 사후 대응적(전력 생산에 영향을 미치는 고장 발생 후)으로 이루어질 수 있다. 또한 여기에는 주요 부품이 터빈 설계 수명을 다하지 못하여(시공 전에 개입이 계획되었더라도) 크고 작은 부품의 현장 수리 및 교체도 포함된다.
항만제조 항만: 터빈 또는 발전보조기기(BOP) 등 장비가 제조되고 출고되는 곳이다.
건축 항만: 장비를 보관하고 사전 조립 후 최종적으로 조립되어 현장으로 수송한다.
O&M 항만: 운영 및 유지보수 선박 및 지지 자재를 위한 기지 항만.
주요정비항만: 부유식 해상풍력터빈의 주요 수리를 지원할 수 있는 항만.
원격조정장치(ROV)ROV는 원격으로 유도되는 해저 이동형 장치이다. 일반적으로 배에 비치하고 검사, 조작, 수리 시 사용할 수 있다.
자체 추진 모듈 트레일러(SPMT)SPMT는 원격으로 작동되는 평상형 트럭으로, 항만 및 건설 현장 주변에서 크고 무거운 물체를 운반하는 데 사용된다.
반잠수식부유식 하부 구조물의 주요 유형이다. 폰툰 및 / 또는 트러스로 연결된 여러 개의 부력 기둥 또는 터렛(회전식 계류장치)으로 구성된 대형 구조물이다. 일반적으로 안정성을 높이기 위해 밸러스트를 사용한다.
정비 작업 선박(SOV)O&M 중에 인력을 터빈으로 수송하기 위한 숙박 시설, 작업장, 장비를 제공하는 선박이다. 오늘날에는 일반적으로 최대 85m 길이로 약 60명이 숙박하는 선박을 운행한다.
유의파고(HS)특정 시간 주기에서 일어나는 파고 중 가장 높은 파랑의 1/3에 해당하는 파랑 높이(최저점에서 최고점)이다.
스파형부유식 하부 구조물의 주요 유형이다. 하부에 밀도가 높은 밸러스트가 있는 긴 실린더 하우징으로 구성되어 있으며 흘수가 크다.
감독 제어 및 데이터 수집(SCADA) 시스템풍력발전단지의 설비 전체 데이터 수집, 전송, 저장 시스템. SCADA 시스템을 통해 개별 풍력 터빈, 풍력 발전 변전소, 관련 풍력 발전 장비의 작동 상태(결함 포함)가 전달된다. 이를 통해 운영자는 원격으로 결함을 진단하고 터빈 및 기타 장비를 정지, 시동, 재설정하는 명령을 내릴 수 있다. SCADA 시스템을 통해 풍력발전단지의 전체 운영 기록을 유지한다.
인장각형(Tension leg platforms)(TLP)부유식 하부 구조물의 주요 유형이다. 다른 유형의 부유식 하부 구조물에 비해 상대적으로 크기가 작으며 수직, 또는 거의 수직인 텐던이 안정성을 제공한다.
트랜지션 피스플랫폼과 풍력 터빈 타워를 연결하는 플랫폼의 부품이다. 부유식 하부 구조물의 경우 일반적으로 플랫폼에 필수적으로 필요하다.
터빈 정격 출력풍력 터빈의 공칭 최대 출력으로 때로는 이를 정격 용량이라고도 한다. 이는 허브 높이에서 풍속이 대략 12m/s를 초과할 때 전형적으로 적용되는 최대 전원 출력으로, 풍속이 약 25~30m/s에 도달할 때까지 이 수준을 유지하다가그 이상의 풍속에서는과도한 기계적 스트레스를 방지하기 위해 터빈이 멈추게 된다. 주변 온도, 주 부품 온도, 풍속, 난기류 수준, 전력망 전압 수준이 특징인 양호한 작동 조건에서는 출력이 정격 전력을 약 5% 초과할 수 있다.
불발탄(UXO)발사 시에 폭발하지 않고 해저 이용자들에게 위험성이 있는 폭발성 무기.
가중평균자본비용(WACC)풍력발전단지 소유업체가 프로젝트 수명 동안 자체 및 내/외부 투자자에게 제공하기 위해 달성하고자 예상하는 가중 평균 수익률.
바람 전단(Winds Shear)높이에 따라 풍속이 변하는 정도.
작업 완료일(WCD)건설 공사가 완료된 것으로 간주되어 풍력발전단지를 운영팀에 인도하는 날짜. 실제로는 일정 기간에 걸쳐 진행될 수 있다.